Development of locks on the Murray River (volume 2) [B 71136/1-261] • Photograph

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - looking west after flooding of first section June 1939

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - experimental type of gate

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - adopted type of Taintor gate

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - placing gate with temporary gantry

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - gates in open position

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - gates up and down

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - gates up and down

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

placing gates at Ewe Island

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere - handling gates onto structure with derrick boat

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere - handling gates onto structure with derrick boat

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

deterioration of dipped tar coat in sun - June & July

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

deterioration of dipped tar coat in sun - June & July

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere lock chamber - placing base slab

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere lock chamber - placing base slab

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere lock chamber - placing base slab

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere lock chamber - views of concreting and formwork

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere lock chamber - views of concreting and formwork

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere lock chamber - views of concreting and formwork

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere lock chamber - views of concreting and formwork

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere - more views of lock chamber

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere - more views of lock chamber

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere - more views of lock chamber

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere - more views of lock chamber

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere lock chamber - cleaning reinforcing steel - approx. concrete proportions: 1.0 cement / 1.0 quartzite sand / 0.7 Inman River sand / 0.2 Marks Point sand / 3.4 quartzite - 1/4" to 3/4" / W/C ration 0.6

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

sand bagged rail track and stack of Marks Point sand

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

metal stack

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

loading quartzite sand into trucks

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

trucks of guaged material ready for mixer-cement under canvas cover

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

two types of mixer used - two bag mix

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

two types of mixer used - two bag mix