Development of locks on the Murray River (volume 2) [B 71136/1-261] • Photograph


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - looking west after flooding of first section June 1939


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - experimental type of gate


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - adopted type of Taintor gate


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - placing gate with temporary gantry


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - gates in open position


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - gates up and down


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - gates up and down


Development of locks on the Murray River (volume 2)
placing gates at Ewe Island


Development of locks on the Murray River (volume 2)
Tauwitchere - handling gates onto structure with derrick boat


Development of locks on the Murray River (volume 2)
Tauwitchere - handling gates onto structure with derrick boat


Development of locks on the Murray River (volume 2)
deterioration of dipped tar coat in sun - June & July


Development of locks on the Murray River (volume 2)
deterioration of dipped tar coat in sun - June & July


Development of locks on the Murray River (volume 2)
Tauwitchere lock chamber - placing base slab


Development of locks on the Murray River (volume 2)
Tauwitchere lock chamber - placing base slab


Development of locks on the Murray River (volume 2)
Tauwitchere lock chamber - placing base slab


Development of locks on the Murray River (volume 2)
Tauwitchere lock chamber - views of concreting and formwork


Development of locks on the Murray River (volume 2)
Tauwitchere lock chamber - views of concreting and formwork


Development of locks on the Murray River (volume 2)
Tauwitchere lock chamber - views of concreting and formwork


Development of locks on the Murray River (volume 2)
Tauwitchere lock chamber - views of concreting and formwork


Development of locks on the Murray River (volume 2)
Tauwitchere - more views of lock chamber


Development of locks on the Murray River (volume 2)
Tauwitchere - more views of lock chamber


Development of locks on the Murray River (volume 2)
Tauwitchere - more views of lock chamber


Development of locks on the Murray River (volume 2)
Tauwitchere - more views of lock chamber


Development of locks on the Murray River (volume 2)
Tauwitchere lock chamber - cleaning reinforcing steel - approx. concrete proportions: 1.0 cement / 1.0 quartzite sand / 0.7 Inman River sand / 0.2 Marks Point sand / 3.4 quartzite - 1/4" to 3/4" / W/C ration 0.6


Development of locks on the Murray River (volume 2)
sand bagged rail track and stack of Marks Point sand


Development of locks on the Murray River (volume 2)
metal stack


Development of locks on the Murray River (volume 2)
loading quartzite sand into trucks


Development of locks on the Murray River (volume 2)
trucks of guaged material ready for mixer-cement under canvas cover


Development of locks on the Murray River (volume 2)
two types of mixer used - two bag mix


Development of locks on the Murray River (volume 2)
two types of mixer used - two bag mix