Development of locks on the Murray River (volume 2) [B 71136/1-261] • Photograph


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - trimmed rock foundation showing longitudinal trenches for concrete cut-off walls and cross trench for drainage


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - excavation of foundation lock chamber


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - excavation of foundation lock chamber


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - excavation of foundation lock chamber


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - concreting base slab apron - barrow carries 1/9 cubic yard


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - an impression of wet weather concreting


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - concrete in piers - compaction by internal type pneumatic vibrator


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - two views of reinforcement of apron slab


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - two views of reinforcement of apron slab


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - base slab and apron reinforcement


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - stripping transverse face of slab on third day


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - island monolith of base slab - sill height 18 inches, sill level is constant for full length of barrage - 322 openings of 12 ft. 9 in. - sill height varies from 24 inches to zero


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - setting of template for bolts to hold pier forms at different slab level


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - setting of template for bolts to hold pier forms at different slab level


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - inside face of steel form showing detachable strip for forming radial groove for Taintor gate


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - setting up steel pier form


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - portion of pier showing setting bars for hinge pins


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - partly stripped pier


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - grouting in hinge pins


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - downstream end of pier


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - crane girder


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - general view of construction


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - hand crane used for placing decking


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - piers


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - piers and decking


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - bridgehead


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - placing decking


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - decking


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - stone abutment at east abutment


Development of locks on the Murray River (volume 2)
Tauwitchere barrage - rake of trucks moving across structure