Development of locks on the Murray River (volume 2) [B 71136/1-261] • Photograph

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere Island - protection

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere Island - protection

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Ewe Island - sealing foundations after Easter flood 1938

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - cofferdam looking toward Pelican Point

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - P.S. Murrabit in approach channel pumping water into storage tanks on shore

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - constructing earth cofferdam bank on sand bag core

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - constructing earth cofferdam bank on sand bag core

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - constructing earth cofferdam bank on sand bag core

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - views of cofferdam cell 1000' x 200'

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - views of cofferdam cell 1000' x 200'

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - views of cofferdam cell 1000' x 200'

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - views of cofferdam cell 1000' x 200'

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - cutting bank between cofferdam cells

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - cutting bank between cofferdam cells; 105-106 - building new end bank to shorten cofferdam and to rail connection from completed structure

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

rail system at eastern abutment

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

removal of spoil from cofferdam bank

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

3-4 H.P. diesel pump unit elevated to facilitate salvage in case of breach during the removal of cofferdam fill

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

three views of cofferdam after break during removal

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

three views of cofferdam after break during removal

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

three views of cofferdam after break during removal

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

main embankment - side slope 1 on 4, top width 17 ft, protection on slope - 2 in. limestone 6 in., 10 in. limestone 1 ft.

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - forming batter on embankment

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - spreading spoil to clear tracks

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

dumping earth core to bank from floating bridgeway - this supersedes the use of a sand bag core

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

dumping earth core to bank from floating bridgeway - this supersedes the use of a sand bag core

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - moving forward barge and leads

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - portion of bank behind west abutment as built within the cofferdam

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - looking along bank toward bank built out from Tauwitchere Island

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - levelling rock foundation with pneumatic drill and removal of spoil

Development of locks on the Murray River (volume 2)

Development of locks on the Murray River (volume 2)

Tauwitchere barrage - salvage of cofferdam protection